IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

334

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0523 # 05 Y:2002 05 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,423 $2,200 Not Implemented
MA0523 # 04 Y:2002 04 2002 PAY BILLS ON TIME TO AVOID LATE FEES $1,510 $0 Implemented
MA0523 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,108 $0 Implemented
MA0523 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $6,907 $11,770 Implemented
MA0523 # 01 Y:2002 01 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $14,262 $23,900 Not Implemented
MA0506 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $982 $3,275 Implemented
MA0506 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,289 $1,100 Implemented
MA0506 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,391 $1,102 Implemented
MA0506 # 03 Y:2002 03 2002 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $3,778 $0 Not Implemented
MA0506 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,604 $13,500 Not Implemented
MA0506 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,554 $9,225 Implemented
MA0508 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $842 $1,000 Not Implemented
MA0508 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,586 $0 Implemented
MA0508 # 04 Y:2002 04 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,108 $400 Implemented
MA0508 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,878 $3,513 Implemented
MA0508 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,830 $5,950 Implemented
MA0508 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $29,135 $0 Implemented
MA0467 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,467 $640 Implemented
MA0467 # 02 Y:2000 02 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $6,077 $4,000 Implemented
MA0467 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,974 $4,200 Implemented
MA0467 # 04 Y:2000 04 2000 INSULATE FEEDWATER TANK $1,316 $800 Not Implemented
MA0467 # 06 Y:2000 06 2000 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $951 $500 Implemented
MA0467 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $1,140 $1,500 Implemented
MA0467 # 07 Y:2000 07 2000 INSULATE FEEDWATER TANK $490 $1,100 Implemented
MA0444 # 06 Y:1999 06 1999 MODIFY STARTUP/SHUTDOWN TIMES $3,766 $0 Not Implemented