IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,319

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0132 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $667 $300 Implemented
UM0132 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $349 $1,000 Implemented
UM0132 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $815 $990 Implemented
UM0132 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,503 $3,700 Implemented
UM0132 # 07 Y:1999 07 1999 USE LOW VOC OR WATER BASED PAINT $5,439 $500 Implemented
UM0132 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $53,333 $1,548 Not Implemented
UM0114 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,627 $3,217 Implemented
UM0114 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,918 $17,712 Implemented
UM0114 # 03 Y:1998 03 1998 USE RADIANT HEATER FOR SPOT HEATING $1,806 $192 Not Implemented
UM0114 # 04 Y:1998 04 1998 $22,312 $2,560 Not Implemented
UM0114 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $22,600 $2,400 Implemented
UM0114 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $16,900 $33,000 Not Implemented
WV0129 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,294 $12,594 Implemented
WV0129 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,704 $205 Not Implemented
WV0129 # 03 Y:1997 03 1997 USE SYNTHETIC LUBRICANT $1,750 $375 Implemented
WV0129 # 04 Y:1997 04 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $550 $500 Implemented
WV0129 # 05 Y:1997 05 1997 INSTALL AUTOMATIC STACK DAMPER $1,848 $250 Not Implemented
WV0129 # 06 Y:1997 06 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $240 $1,475 Not Implemented
WV0129 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $53 $44 Implemented
WV0129 # 08 Y:1997 08 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $60,000 $200 Not Implemented
WV0129 # 09 Y:1997 09 1997 RECOVER AND REUSE COOLING WATER $5,824 $2,300 Implemented
WV0129 # 10 Y:1997 10 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $420,000 $35,000 Not Implemented
UD0530 # 01 Y:1997 01 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,055 $2,200 Not Implemented
UD0530 # 02 Y:1997 02 1997 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,250 $5,600 Implemented
UD0530 # 03 Y:1997 03 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,540 $37,500 Not Implemented