IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

896

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0724 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $126 $210 Implemented
AM0706 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,870 $20 Implemented
AM0706 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $8,000 $0 Not Implemented
AM0706 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $5,687 $19,900 Implemented
AM0706 # 04 Y:2016 04 2016 INSTALL HYDROGEN FUEL CELL $3,180 $0 Not Implemented
AM0706 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,425 $1,350 Implemented
AM0706 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $940 $200 Implemented
AM0706 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $586 $200 Implemented
AM0706 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $65 $60 Implemented
AM0688 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,420 $36,000 Not Implemented
AM0688 # 02 Y:2015 02 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $33,890 $0 Implemented
AM0688 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,270 $26,600 Implemented
AM0688 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,290 $12,000 Implemented
AM0688 # 05 Y:2015 05 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,220 $1,880 Implemented
AM0688 # 06 Y:2015 06 2015 KEEP LAMPS AND REFLECTORS CLEAN $8,140 $4,320 Not Implemented
AM0688 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,060 $120 Not Implemented
AM0688 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $4,230 $5,100 Implemented
AM0688 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,710 $40 Implemented
AM0688 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,690 $0 Implemented
AM0688 # 11 Y:2015 11 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,560 $240 Implemented
AM0688 # 12 Y:2015 12 2015 USE PHOTOCELL CONTROLS $730 $165 Implemented
AM0673 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,785 $15,000 Implemented
AM0673 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,669 $18 Implemented
AM0673 # 03 Y:2015 03 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $26,256 $6,650 Not Implemented
AM0673 # 04 Y:2015 04 2015 USE SYNTHETIC LUBRICANT $5,862 $0 Implemented