IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

576

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0332 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $272 $2 Not Implemented
BD0332 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $496 $351 Not Implemented
BD0332 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $23,837 $40,001 Not Implemented
BD0332 # 07 Y:2007 07 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,182 $2 Not Implemented
BD0300 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $6,218 $2,772 Implemented
BD0300 # 02 Y:2006 02 2006 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $5,526 $500 Implemented
BD0300 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,234 $4,000 Not Implemented
BD0300 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,237 $5,115 Implemented
BD0300 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $963 $3,450 Not Implemented
BD0300 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $508 $825 Not Implemented
BD0300 # 07 Y:2006 07 2006 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $464 $1,000 Not Implemented
BD0300 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $188 $250 Implemented
BD0300 # 09 Y:2006 09 2006 INSTALL EQUIPMENT TO MOVE PRODUCT $18,720 $17,500 Not Implemented
BD0295 # 01 Y:2005 01 2005 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $32,765 $600 Implemented
BD0295 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,254 $8,470 Implemented
BD0295 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,391 $900 Implemented
BD0295 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $14,253 $2,875 Implemented
BD0295 # 05 Y:2005 05 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,487 $3,000 Implemented
BD0295 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,724 $0 Implemented
BD0295 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $423 $0 Implemented
BD0291 # 01 Y:2005 01 2005 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $126,274 $320,000 Not Implemented
BD0291 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $18,984 $17,000 Not Implemented
BD0291 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,444 $2,886 Not Implemented
BD0291 # 04 Y:2005 04 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $11,415 $13,500 Not Implemented
BD0291 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,030 $2,850 Not Implemented