IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,307

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0953 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $5,190 $348 Not Implemented
UD0953 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,619 $0 Not Implemented
UD0953 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $577 $1,500 Not Implemented
UD0953 # 04 Y:2016 04 2016 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,540 $25,000 Not Implemented
UD0953 # 05 Y:2016 05 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $10,677 $32,500 Not Implemented
UD0953 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $3,158 $9,400 Not Implemented
UD0953 # 07 Y:2016 07 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $634 $0 Implemented
UD0953 # 08 Y:2016 08 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $964 $5,300 Not Implemented
UD0953 # 09 Y:2016 09 2016 IMPROVE HANDLING PRACTICES $35,646 $100,000 Not Implemented
WV0529 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $3,852 $1,833 Not Implemented
WV0529 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,370 $980 Not Implemented
WV0529 # 03 Y:2016 03 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,056 $1,000 Not Implemented
WV0529 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $993 $125 Implemented
WV0529 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $651 $1,922 Implemented
WV0529 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $624 $1,090 Not Implemented
WV0529 # 07 Y:2016 07 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $498 $585 Implemented
WV0529 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $234 $90 Implemented
WV0529 # 09 Y:2016 09 2016 DEVELOP A REPAIR/REPLACE POLICY $83 $168 Implemented
UD0940 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,751 $0 Implemented
UD0940 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,203 $0 Implemented
UD0940 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $15,056 $750 Not Implemented
UD0940 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,308 $0 Implemented
UD0940 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $4,195 $1,683 Not Implemented
UD0940 # 06 Y:2016 06 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,717 $1,500 Implemented
UD0940 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,236 $5,400 Not Implemented