Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
224
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0099 # 01 Y:1990 | 01 | 1990 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $669 | $50 | Implemented |
OR0099 # 02 Y:1990 | 02 | 1990 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $511 | $60 | Implemented |
OR0099 # 04 Y:1990 | 04 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $399 | $1,480 | Not Implemented |
UD0329 # 03 Y:1990 | 03 | 1990 | BURN WASTE OIL FOR HEAT | $6,067 | $0 | Implemented |
UD0329 # 01 Y:1990 | 01 | 1990 | OPTIMIZE PLANT POWER FACTOR | $17,856 | $20,000 | Implemented |
OR0099 # 03 Y:1990 | 03 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $53 | $117 | Not Implemented |
UD0329 # 02 Y:1990 | 02 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,309 | $1,000 | Implemented |
OR0099 # 05 Y:1990 | 05 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,167 | $20,751 | Not Implemented |
UD0329 # 05 Y:1990 | 05 | 1990 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,223 | $6,240 | Implemented |
UD0329 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,783 | $7,500 | Implemented |
OK0329 # 01 Y:1990 | 01 | 1990 | INSTALL TURBULATORS | $536 | $1,550 | Not Implemented |
OK0330 # 03 Y:1990 | 03 | 1990 | INSULATE BARE EQUIPMENT | $3,218 | $2,838 | Implemented |
MA0196 # 01 Y:1990 | 01 | 1990 | INSULATE BARE EQUIPMENT | $583 | $381 | Not Implemented |
OK0330 # 02 Y:1990 | 02 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $156 | $0 | Implemented |
MA0196 # 02 Y:1990 | 02 | 1990 | INCREASE AMOUNT OF CONDENSATE RETURNED | $9,178 | $2,409 | Not Implemented |
MA0197 # 02 Y:1990 | 02 | 1990 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,166 | $642 | Implemented |
MA0197 # 07 Y:1990 | 07 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $6,639 | $19,720 | Not Implemented |
MA0197 # 06 Y:1990 | 06 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,680 | $927 | Implemented |
MA0197 # 05 Y:1990 | 05 | 1990 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $972 | $0 | Implemented |
MA0197 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,726 | $10,622 | Implemented |
OK0330 # 01 Y:1990 | 01 | 1990 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,537 | $16,218 | Not Implemented |
OK0329 # 04 Y:1990 | 04 | 1990 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $290 | $0 | Implemented |
MA0196 # 09 Y:1990 | 09 | 1990 | INSTALL SET-BACK TIMERS | $65 | $65 | Not Implemented |
WI0104 # 09 Y:1990 | 09 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,766 | $1,600 | Not Implemented |
OK0329 # 05 Y:1990 | 05 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $2,363 | $450 | Implemented |