Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0791 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $335 $8 Implemented
AM0791 # 06 Y:2019 06 2019 PAY UTILITY BILLS ON TIME $540 $0 Implemented
AM0791 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $40,100 $66,545 Implemented
AM0791 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $56,640 $5,000 Implemented
AM0791 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $282,870 $5,000 Implemented
TT0232 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $22,260 $107,529 Implemented
SU0492 # 06 Y:2019 06 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $730 $732 Implemented
SU0492 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,822 $120 Implemented
UK1912 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,364 $30,555 Implemented
UK1912 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,541 $0 Implemented
UK1912 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,487 $2,150 Implemented
UK1912 # 09 Y:2019 09 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $86,767 $5,000 Implemented
SU0488 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,216 $264 Implemented
IC0221 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,226 $7,471 Implemented
IC0221 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,682 $4,200 Implemented
MZ0278 # 10 Y:2019 10 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,709 $200 Implemented
MZ0278 # 09 Y:2019 09 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,558 $870 Implemented
MZ0278 # 01 Y:2019 01 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $902,475 $6,762,500 Implemented
MZ0278 # 02 Y:2019 02 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $382,507 $601,250 Implemented
MZ0278 # 07 Y:2019 07 2019 UPGRADE CONTROLS ON COMPRESSORS $42,284 $13,051 Implemented
MZ0278 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $176,232 $3,250 Implemented
MZ0278 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $45,917 $2,907 Implemented
MZ0278 # 04 Y:2019 04 2019 REDUCE SCRAP PRODUCTION $126,263 $207,500 Implemented
SD0586 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,548 $17,875 Implemented
SD0586 # 06 Y:2019 06 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,834 $2,795 Implemented