IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 3081 Unsupported Plastics Film & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0162 # 06 Y:1997 06 1997 COVER INK CONTAINERS WHEN NOT IN USE $337 $0 Implemented
HO0162 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,465 $800 Implemented
HO0162 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,888 $9,937 Implemented
BD0093 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,718 $25,480 Implemented
BD0093 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,147 $1,827 Implemented
DS0089 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $41,641 $2,315 Implemented
DS0089 # 03 Y:1997 03 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,298 $1,100 Implemented
DS0089 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $7,041 $1,750 Implemented
MA0382 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,713 $200 Implemented
MA0382 # 02 Y:1997 02 1997 $2,296 $5,000 Implemented
MA0382 # 01 Y:1997 01 1997 INSULATE BARE EQUIPMENT $1,954 $1,527 Implemented
HO0143 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,952 $4,592 Implemented
HO0143 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $618 $1,160 Implemented
HO0143 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,568 $6,500 Implemented
HO0143 # 07 Y:1997 07 1997 $41,305 $100 Implemented
AM0286 # 12 Y:1997 12 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $200 $214 Implemented
AM0286 # 11 Y:1997 11 1997 INSULATE BARE EQUIPMENT $750 $230 Implemented
AM0286 # 10 Y:1997 10 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $800 $0 Implemented
AM0286 # 09 Y:1997 09 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,450 $40 Implemented
AM0286 # 04 Y:1997 04 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $13,260 $0 Implemented
AM0286 # 03 Y:1997 03 1997 REDUCE SCRAP PRODUCTION $23,650 $6,000 Implemented
AM0286 # 02 Y:1997 02 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $24,880 $1,000 Implemented
AM0286 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $98,400 $167,600 Implemented