Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
229
matching recommendationsSIC | 3083 | Laminated Plastics Plate & Sheet |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0615 # 10 Y:2012 | 10 | 2012 | USE SYNTHETIC LUBRICANT | $760 | $0 | Implemented |
AM0613 # 01 Y:2012 | 01 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $21,010 | $38,103 | Implemented |
AM0613 # 02 Y:2012 | 02 | 2012 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $16,300 | $20,900 | Implemented |
AM0613 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,265 | $600 | Implemented |
AM0613 # 05 Y:2012 | 05 | 2012 | USE PHOTOCELL CONTROLS | $3,000 | $1,000 | Implemented |
AM0613 # 06 Y:2012 | 06 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $694 | $108 | Implemented |
AM0613 # 07 Y:2012 | 07 | 2012 | USE PHOTOCELL CONTROLS | $49 | $100 | Implemented |
LE0317 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,617 | $13,469 | Implemented |
LE0317 # 02 Y:2011 | 02 | 2011 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $185,253 | $118,000 | Implemented |
LE0317 # 01 Y:2011 | 01 | 2011 | REPLACE BOILER | $284,580 | $500,000 | Implemented |
LE0317 # 06 Y:2011 | 06 | 2011 | REPAIR OR REPLACE STEAM TRAPS | $23,321 | $4,200 | Implemented |
LE0317 # 07 Y:2011 | 07 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,721 | $22,000 | Implemented |
LE0317 # 08 Y:2011 | 08 | 2011 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,375 | $100,000 | Implemented |
LE0317 # 09 Y:2011 | 09 | 2011 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $8,387 | $8,000 | Implemented |
LE0317 # 10 Y:2011 | 10 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,358 | $870 | Implemented |
LE0317 # 11 Y:2011 | 11 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,938 | $3,000 | Implemented |
LE0317 # 13 Y:2011 | 13 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,553 | $2,440 | Implemented |
LE0317 # 15 Y:2011 | 15 | 2011 | INSTALL OCCUPANCY SENSORS | $1,097 | $2,035 | Implemented |
LE0317 # 16 Y:2011 | 16 | 2011 | INSTALL OCCUPANCY SENSORS | $153 | $1,000 | Implemented |
MZ0055 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,916 | $1,100 | Implemented |
MZ0055 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,282 | $16,460 | Implemented |
MZ0055 # 06 Y:2010 | 06 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $0 | $0 | Implemented |
MZ0055 # 07 Y:2010 | 07 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $0 | $0 | Implemented |
MZ0055 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,900 | $1,160 | Implemented |
LE0301 # 03 Y:2010 | 03 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,617 | $13,469 | Implemented |