Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
410
matching recommendationsSIC | 3083 | Laminated Plastics Plate & Sheet |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0323 # 09 Y:1999 | 09 | 1999 | CONVERT TO AQUEOUS CLEANING SYSTEM | $114 | $100 | Not Implemented |
ND0323 # 10 Y:1999 | 10 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $109 | $360 | Not Implemented |
ND0323 # 11 Y:1999 | 11 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $106 | $200 | Implemented |
ND0323 # 12 Y:1999 | 12 | 1999 | USE OPTIMUM TEMPERATURE | $32 | $10 | Implemented |
HO0193 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,758 | $16,993 | Implemented |
HO0193 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $785 | $1,000 | Implemented |
HO0193 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,524 | $360 | Implemented |
HO0193 # 04 Y:1999 | 04 | 1999 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $395 | $400 | Implemented |
HO0193 # 05 Y:1999 | 05 | 1999 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $825 | $2,000 | Implemented |
HO0193 # 06 Y:1999 | 06 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,000 | $300 | Implemented |
HO0193 # 07 Y:1999 | 07 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,872 | $3,500 | Not Implemented |
HO0193 # 08 Y:1999 | 08 | 1999 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $2,000 | $10,000 | Not Implemented |
HO0193 # 09 Y:1999 | 09 | 1999 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $5,000 | $3,000 | Not Implemented |
GT0628 # 01 Y:1997 | 01 | 1997 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $86,500 | $120,000 | n/a |
GT0628 # 02 Y:1997 | 02 | 1997 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $186,200 | $245,000 | n/a |
GT0628 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,903 | $37,960 | n/a |
GT0628 # 04 Y:1997 | 04 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,263 | $5,550 | n/a |
GT0628 # 05 Y:1997 | 05 | 1997 | MINIMIZE WATER USAGE | $2,924 | $0 | n/a |
GT0628 # 06 Y:1997 | 06 | 1997 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $23,066 | $72,100 | n/a |
GT0628 # 07 Y:1997 | 07 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $37,000 | $0 | n/a |
IA0173 # 01 Y:1997 | 01 | 1997 | RECOVER AND REUSE COOLING WATER | $99,165 | $105,000 | Not Implemented |
IA0173 # 02 Y:1997 | 02 | 1997 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,284 | $4,100 | Not Implemented |
IA0173 # 03 Y:1997 | 03 | 1997 | UPGRADE CONTROLS ON COMPRESSORS | $4,119 | $5,200 | Implemented |
IA0173 # 04 Y:1997 | 04 | 1997 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $4,250 | $6,300 | Not Implemented |
IA0173 # 05 Y:1997 | 05 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $475 | $592 | Implemented |