IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 3083 Laminated Plastics Plate & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0628 # 02 Y:1997 02 1997 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $186,200 $245,000 n/a
GT0628 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,903 $37,960 n/a
GT0628 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $4,263 $5,550 n/a
GT0628 # 05 Y:1997 05 1997 MINIMIZE WATER USAGE $2,924 $0 n/a
GT0628 # 06 Y:1997 06 1997 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $23,066 $72,100 n/a
GT0628 # 07 Y:1997 07 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,000 $0 n/a
GT0628 # 01 Y:1997 01 1997 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $86,500 $120,000 n/a
IA0173 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $804 $1,705 Implemented
IA0173 # 09 Y:1997 09 1997 INSULATE BARE EQUIPMENT $114 $176 Implemented
IA0173 # 08 Y:1997 08 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $325 $139 Implemented
IA0173 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $538 Implemented
IA0173 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $475 $592 Implemented
IA0173 # 04 Y:1997 04 1997 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $4,250 $6,300 Not Implemented
IA0173 # 03 Y:1997 03 1997 UPGRADE CONTROLS ON COMPRESSORS $4,119 $5,200 Implemented
IA0173 # 02 Y:1997 02 1997 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,284 $4,100 Not Implemented
IA0173 # 01 Y:1997 01 1997 RECOVER AND REUSE COOLING WATER $99,165 $105,000 Not Implemented
SD0176 # 08 Y:1997 08 1997 INSTALL SYSTEM TO COLLECT SCRAP $618,145 $200,000 Not Implemented
SD0176 # 07 Y:1997 07 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $133,998 $30,000 Implemented
SD0176 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $14,812 $0 Implemented
SD0176 # 05 Y:1997 05 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $16,243 $15,295 Implemented
SD0176 # 04 Y:1997 04 1997 UPGRADE CONTROLS ON COMPRESSORS $6,499 $22,356 Implemented
SD0176 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $878 $500 Implemented
SD0176 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,636 $1,250 Implemented
SD0176 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,704 $0 Implemented
SD0165 # 09 Y:1997 09 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $50,000 $0 Implemented