IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0395 # 06 Y:2011 06 2011 USE COMPRESSOR AIR FILTERS $1,038 $1,467 Implemented
SF0395 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,833 $5,753 Implemented
SF0395 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,313 $7,243 Implemented
SF0395 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,312 $0 Implemented
SF0395 # 01 Y:2011 01 2011 INSTALL TIMERS AND/OR THERMOSTATS $6,724 $0 Implemented
SF0395 # 10 Y:2011 10 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,772 $18,000 Implemented
SF0395 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $8,140 $22,037 Implemented
SF0395 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,112 $6,182 Implemented
SF0236 # 05 Y:2002 05 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,418 $5,500 Implemented
SF0236 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,490 $1,146 Implemented
SF0236 # 02 Y:2002 02 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,632 $440 Implemented
SF0236 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,279 $0 Implemented
SD0071 # 03 Y:1994 03 1994 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $15,214 $24,880 Implemented
SD0071 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $881 $3,241 Implemented
SD0071 # 06 Y:1994 06 1994 INSTALL TIMERS AND/OR THERMOSTATS $587 $300 Implemented
SD0071 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,613 $0 Implemented
SD0071 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $473 $136 Implemented
SD0071 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,894 $27,500 Implemented
SD0067 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,899 $2,345 Implemented
SD0067 # 10 Y:1993 10 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43 $0 Implemented
SD0067 # 09 Y:1993 09 1993 INSTALL SET-BACK TIMERS $596 $720 Implemented
SD0067 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,718 $93 Implemented
SD0067 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $9,548 $1,408 Implemented
SD0067 # 04 Y:1993 04 1993 REDUCE VENTILATION AIR $111 $55 Implemented
SD0067 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,595 $180 Implemented