IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0921 # 05 Y:2015 05 2015 REDUCE FLUID FLOW RATES $32,332 $5,000 Implemented
OK0921 # 04 Y:2015 04 2015 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $89,313 $72,000 Implemented
OK0921 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $13,915 $4,348 Implemented
OK0921 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,026 $832 Not Implemented
OK0921 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,838 $28,060 Implemented
LL0304 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101 $70 Implemented
LL0304 # 06 Y:2008 06 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $823 $1,246 Not Implemented
LL0304 # 05 Y:2008 05 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,456 $825 Not Implemented
LL0304 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,714 $30 Not Implemented
LL0304 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $9,892 $1,118 Not Implemented
LL0304 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,876 $20,949 Not Implemented
LL0304 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $59,266 $14,840 Implemented
AR0118 # 12 Y:1997 12 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $100,000 $240,000 Not Implemented
AR0118 # 11 Y:1997 11 1997 BURN WASTE OIL FOR HEAT $3,610 $6,500 Not Implemented
AR0118 # 10 Y:1997 10 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $14,278 $8,000 Not Implemented
AR0118 # 08 Y:1997 08 1997 INSULATE BARE EQUIPMENT $1,556 $392 Not Implemented
AR0118 # 09 Y:1997 09 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $464 $675 Not Implemented
AR0118 # 07 Y:1997 07 1997 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $11,370 $5,000 Not Implemented
AR0118 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $261 $100 Implemented
AR0118 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,466 $210 Implemented
AR0118 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $293 $0 Implemented
AR0118 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,472 $4,700 Implemented
AR0118 # 02 Y:1997 02 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $436 $335 Implemented
AR0118 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $391 $676 Not Implemented
AR0096 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,513 $477 Implemented