IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

703

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0165 # 09 Y:1999 09 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $7,875 $65 Implemented
WV0165 # 08 Y:1999 08 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,420 $0 Implemented
WV0165 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $2,680 $6,918 Implemented
WV0165 # 05 Y:1999 05 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $923 $1,250 Not Implemented
WV0165 # 04 Y:1999 04 1999 PAY UTILITY BILLS ON TIME $1,874 $0 Implemented
WV0165 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,469 $4,300 Not Implemented
WV0165 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,484 $45 Not Implemented
WV0165 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,350 $100 Implemented
OK0576 # 01 Y:1999 01 1999 REDUCE EXCESSIVE BOILER BLOWDOWN $11,368 $16,000 Not Implemented
OK0576 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,672 $17,813 Implemented
OK0576 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $279 $140 Implemented
OK0576 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $228 $68 Not Implemented
OK0576 # 05 Y:1999 05 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $22,560 $40,000 Implemented
OK0576 # 06 Y:1999 06 1999 IMPROVE SPACE COMFORT CONDITIONING $4,518 $3,990 Implemented
OK0576 # 07 Y:1999 07 1999 RECOVER AND REUSE WASTE MATERIAL $1,939 $5,000 Not Implemented
OR0336 # 01 Y:1999 01 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $93,600 $200,000 Implemented
OR0336 # 02 Y:1999 02 1999 INSTALL SENSORS TO DETECT DEFECTS $31,700 $0 Implemented
OR0336 # 03 Y:1999 03 1999 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $27,050 $8,200 Not Implemented
OR0336 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $3,716 $10,200 Not Implemented
OR0337 # 01 Y:1999 01 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $44,432 $21,400 Not Implemented
OR0337 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,060 $0 Implemented
OR0337 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $9,949 $13,663 Implemented
OR0337 # 04 Y:1999 04 1999 USE LESS WASTEFUL PACKAGING $34,000 $73,000 Not Implemented
OR0337 # 05 Y:1999 05 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $11,000 $28,700 Implemented
TN0644 # 01 Y:1998 01 1998 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $363,750 $20,000 Not Implemented