IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

677

matching recommendations
Reset
SIC 3084 Plastics Pipe
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0596 # 11 Y:2020 11 2020 DEVELOP A REPAIR/REPLACE POLICY $1,750 $372 Implemented
WV0596 # 12 Y:2020 12 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,108 $1,828 Implemented
WV0596 # 13 Y:2020 13 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $746 $60 Implemented
WV0596 # 14 Y:2020 14 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $626 $4,034 Implemented
WV0596 # 15 Y:2020 15 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $507 $700 Implemented
WV0596 # 16 Y:2020 16 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $326 $1,500 Implemented
WV0596 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,729 $1,600 Implemented
MI0331 # 01 Y:2018 01 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,963 $15,690 Implemented
MI0331 # 02 Y:2018 02 2018 INCREASE EFFICIENCY OF TRUCKS $6,044 $5,800 Not Implemented
MI0331 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,170 $2,020 Not Implemented
MI0331 # 04 Y:2018 04 2018 PAY UTILITY BILLS ON TIME $4,461 $0 Implemented
MI0331 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $4,250 $1,400 Implemented
MI0331 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,515 $4,841 Not Implemented
MI0331 # 07 Y:2018 07 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,868 $531 Not Implemented
MI0331 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $1,823 $340 Not Implemented
MI0331 # 09 Y:2018 09 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,540 $480 Implemented
MI0331 # 10 Y:2018 10 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $962 $2,525 Implemented
MI0331 # 11 Y:2018 11 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $1,875 Implemented
OK0947 # 10 Y:2016 10 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $362 $540 Not Implemented
OK0947 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,092 $2,000 Not Implemented
OK0947 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $368 $822 Not Implemented
OK0947 # 07 Y:2016 07 2016 OPTIMIZE PLANT POWER FACTOR $4,680 $27,500 Not Implemented
OK0947 # 06 Y:2016 06 2016 INSTALL SET-BACK TIMERS $483 $410 Not Implemented
OK0947 # 05 Y:2016 05 2016 USE RADIANT HEATER FOR SPOT HEATING $3,754 $19,570 Not Implemented
OK0947 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $11,683 $10,036 Not Implemented