Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
703
matching recommendationsSIC | 3084 | Plastics Pipe |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0256 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,560 | $150 | Not Implemented |
TT0256 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,816 | $5,000 | Not Implemented |
TT0256 # 02 Y:2021 | 02 | 2021 | METER WASTE WATER | $10,722 | $2,150 | Not Implemented |
TT0256 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,092 | $12,000 | Not Implemented |
NL0057 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,211 | $2,500 | Implemented |
NL0057 # 05 Y:2021 | 05 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $4,782 | $15,170 | Implemented |
NL0057 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,345 | $11,175 | Implemented |
NL0057 # 03 Y:2021 | 03 | 2021 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,271 | $16,980 | Not Implemented |
NL0057 # 02 Y:2021 | 02 | 2021 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $20,793 | $13,100 | Not Implemented |
NL0057 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $74,696 | $154,720 | Not Implemented |
MZ0305 # 06 Y:2021 | 06 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,689 | $240 | Implemented |
MZ0305 # 05 Y:2021 | 05 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $16,340 | $5,200 | Implemented |
MZ0305 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $579 | $320 | Implemented |
MZ0305 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $27,350 | $93,000 | Implemented |
MZ0305 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,692 | $44,928 | Implemented |
MZ0305 # 01 Y:2021 | 01 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,825 | $9,000 | Implemented |
WV0596 # 08 Y:2020 | 08 | 2020 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $3,333 | $14,200 | Not Implemented |
WV0596 # 16 Y:2020 | 16 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $326 | $1,500 | Implemented |
WV0596 # 15 Y:2020 | 15 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $507 | $700 | Implemented |
WV0596 # 14 Y:2020 | 14 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $626 | $4,034 | Implemented |
WV0596 # 13 Y:2020 | 13 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $746 | $60 | Implemented |
WV0596 # 12 Y:2020 | 12 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,108 | $1,828 | Implemented |
WV0596 # 11 Y:2020 | 11 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $1,750 | $372 | Implemented |
WV0596 # 10 Y:2020 | 10 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,829 | $0 | Not Implemented |
WV0596 # 09 Y:2020 | 09 | 2020 | INSULATE BARE EQUIPMENT | $2,311 | $1,566 | Implemented |