IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

397

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0459 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $323 $480 Implemented
UD0490 # 01 Y:1996 01 1996 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $55,282 $12,000 Implemented
UD0474 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $17,216 $20,000 Implemented
UD0474 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $4,012 $300 Implemented
HO0112 # 01 Y:1995 01 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $4,084 $0 Implemented
HO0112 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,162 $300 Implemented
HO0112 # 06 Y:1995 06 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,942 $500 Implemented
NC0058 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $149 $292 Implemented
NC0058 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,902 $30,410 Implemented
NC0058 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,618 $2,500 Implemented
NC0058 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,975 $240 Implemented
NC0058 # 08 Y:1995 08 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,702 $0 Implemented
GT0554 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,760 $21,380 Implemented
GT0554 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,575 $9,118 Implemented
GT0554 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,153 $38,780 Implemented
GT0554 # 05 Y:1995 05 1995 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $12,722 $20,000 Implemented
GT0554 # 09 Y:1995 09 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $6,693 $2,552 Implemented
AM0228 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,270 $1,000 Implemented
AM0228 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,040 $4,660 Implemented
AM0228 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,119 $242 Implemented
UD0449 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,945 $250 Implemented
UD0449 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,532 $0 Implemented
UD0449 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,439 $0 Implemented
UD0449 # 04 Y:1994 04 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,258 $0 Implemented
UD0449 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,815 $0 Implemented