IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

397

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0485 # 09 Y:2012 09 2012 INSTALL OCCUPANCY SENSORS $893 $882 Implemented
IA0485 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,511 $2,009 Implemented
IA0485 # 07 Y:2012 07 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,493 $2,044 Implemented
IA0485 # 05 Y:2012 05 2012 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $774 $989 Implemented
IA0485 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,133 $1,343 Implemented
IA0485 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $688 $525 Implemented
IA0485 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,660 $273 Implemented
NC0455 # 07 Y:2012 07 2012 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $113,133 $50,000 Implemented
NC0455 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,649 $100 Implemented
NC0455 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $17,379 $2,419 Implemented
UD0852 # 08 Y:2012 08 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,333 $50,000 Implemented
UD0852 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,072 $1,000 Implemented
UD0852 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,934 $6,000 Implemented
UD0852 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,349 $0 Implemented
OK0823 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $5,300 $16,148 Implemented
OK0823 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $922 $2,975 Implemented
UD0843 # 09 Y:2011 09 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,145 $650 Implemented
UD0843 # 08 Y:2011 08 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $509 $0 Implemented
UD0843 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,854 $0 Implemented
UD0843 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,289 $4,698 Implemented
UD0843 # 02 Y:2011 02 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,770 $0 Implemented
AM0597 # 04 Y:2011 04 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,970 $0 Implemented
AM0597 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,470 $750 Implemented
AM0597 # 02 Y:2011 02 2011 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $6,900 $0 Implemented
AM0597 # 01 Y:2011 01 2011 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $21,840 $0 Implemented