Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
397
matching recommendationsSIC | 3085 | Plastics Bottles |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0485 # 09 Y:2012 | 09 | 2012 | INSTALL OCCUPANCY SENSORS | $893 | $882 | Implemented |
IA0485 # 08 Y:2012 | 08 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,511 | $2,009 | Implemented |
IA0485 # 07 Y:2012 | 07 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,493 | $2,044 | Implemented |
IA0485 # 05 Y:2012 | 05 | 2012 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $774 | $989 | Implemented |
IA0485 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,133 | $1,343 | Implemented |
IA0485 # 02 Y:2012 | 02 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $688 | $525 | Implemented |
IA0485 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,660 | $273 | Implemented |
NC0455 # 07 Y:2012 | 07 | 2012 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $113,133 | $50,000 | Implemented |
NC0455 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,649 | $100 | Implemented |
NC0455 # 01 Y:2012 | 01 | 2012 | INSULATE BARE EQUIPMENT | $17,379 | $2,419 | Implemented |
UD0852 # 08 Y:2012 | 08 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $15,333 | $50,000 | Implemented |
UD0852 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,072 | $1,000 | Implemented |
UD0852 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,934 | $6,000 | Implemented |
UD0852 # 03 Y:2012 | 03 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,349 | $0 | Implemented |
OK0823 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $5,300 | $16,148 | Implemented |
OK0823 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $922 | $2,975 | Implemented |
UD0843 # 09 Y:2011 | 09 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,145 | $650 | Implemented |
UD0843 # 08 Y:2011 | 08 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $509 | $0 | Implemented |
UD0843 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,854 | $0 | Implemented |
UD0843 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,289 | $4,698 | Implemented |
UD0843 # 02 Y:2011 | 02 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,770 | $0 | Implemented |
AM0597 # 04 Y:2011 | 04 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,970 | $0 | Implemented |
AM0597 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,470 | $750 | Implemented |
AM0597 # 02 Y:2011 | 02 | 2011 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $6,900 | $0 | Implemented |
AM0597 # 01 Y:2011 | 01 | 2011 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $21,840 | $0 | Implemented |