Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
397
matching recommendationsSIC | 3085 | Plastics Bottles |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0873 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $816 | $4,400 | Implemented |
GT0873 # 06 Y:2010 | 06 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $11,661 | $775 | Implemented |
TT0049 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,756 | $173,505 | Implemented |
MZ0045 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,876 | $46,050 | Implemented |
MZ0045 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,734 | $950 | Implemented |
MZ0045 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,645 | $0 | Implemented |
MZ0045 # 05 Y:2009 | 05 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $23,660 | $0 | Implemented |
MZ0017 # 01 Y:2008 | 01 | 2008 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $8,697 | $1,600 | Implemented |
MZ0017 # 03 Y:2008 | 03 | 2008 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $13,980 | $15,763 | Implemented |
UD0756 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $44,237 | $86,570 | Implemented |
UD0756 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,822 | $18,000 | Implemented |
UD0756 # 02 Y:2007 | 02 | 2007 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $54,790 | $0 | Implemented |
UD0756 # 01 Y:2007 | 01 | 2007 | USE POWER DURING OFF-PEAK PERIODS | $58,368 | $0 | Implemented |
UD0756 # 06 Y:2007 | 06 | 2007 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $30,653 | $5,000 | Implemented |
UD0756 # 14 Y:2007 | 14 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $306 | $150 | Implemented |
UD0756 # 13 Y:2007 | 13 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,160 | $4,680 | Implemented |
UD0756 # 12 Y:2007 | 12 | 2007 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $4,769 | $0 | Implemented |
UD0756 # 10 Y:2007 | 10 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,180 | $12,000 | Implemented |
CO0588 # 01 Y:2006 | 01 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,610 | $9,470 | Implemented |
CO0588 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,500 | $50 | Implemented |
CO0588 # 03 Y:2006 | 03 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,244 | $493 | Implemented |
CO0588 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $200 | $510 | Implemented |
CO0588 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,290 | $57,670 | Implemented |
CO0588 # 06 Y:2006 | 06 | 2006 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $1,680 | $1,310 | Implemented |
CO0588 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,600 | $2,970 | Implemented |