IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3085 Plastics Bottles
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2415 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $104,863 $758,879 n/a
UL2415 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,401 $2,438 n/a
UL2415 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,257 $2,700 n/a
UL2415 # 03 Y:2024 03 2024 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $62,771 $58,367 n/a
UL2415 # 02 Y:2024 02 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $72,820 $0 n/a
UL2415 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $28,874 $11,700 n/a
IP0033 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,742 $240 Implemented
IP0033 # 09 Y:2015 09 2015 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $6,096 $25,603 Not Implemented
IP0033 # 08 Y:2015 08 2015 OPTIMIZE PLANT POWER FACTOR $4,939 $10,200 Implemented
IP0033 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,557 $0 Implemented
IP0033 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $520 $144 Not Implemented
IP0033 # 04 Y:2015 04 2015 USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED $4,925 $3,000 Not Implemented
IP0033 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,961 $1,864 Implemented
IP0033 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,018 $3,232 Implemented
IP0033 # 07 Y:2015 07 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,865 $3,720 Not Implemented
UD0852 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $156,438 $342,000 Not Implemented
UD0852 # 09 Y:2012 09 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $27,604 $106,738 Not Implemented
UD0852 # 08 Y:2012 08 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,333 $50,000 Implemented
UD0852 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $94,327 $190,000 Not Implemented
UD0852 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,716 $5,000 Not Implemented
UD0852 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,072 $1,000 Implemented
UD0852 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,934 $6,000 Implemented
UD0852 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,349 $0 Implemented
UD0852 # 02 Y:2012 02 2012 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $13,731 $8,250 Not Implemented
UL0158 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $617 $2,882 Not Implemented