IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

941

matching recommendations
Reset
SIC 3086 Plastics Foam Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0164 # 08 Y:1999 08 1999 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,899 $6,500 Not Implemented
SF0164 # 09 Y:1999 09 1999 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $631 $2,500 Not Implemented
SF0164 # 10 Y:1999 10 1999 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $2,233 $0 Not Implemented
SF0164 # 11 Y:1999 11 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,780 $8,175 Not Implemented
SF0164 # 12 Y:1999 12 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $994 $371 Not Implemented
SF0164 # 13 Y:1999 13 1999 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $14,632 $53,728 Not Implemented
SF0156 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,764 $144 n/a
SF0156 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $434 $167 n/a
SF0156 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $553 $881 n/a
SF0156 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $815 $1,628 n/a
SF0156 # 05 Y:1999 05 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $9,385 $250 n/a
SF0156 # 06 Y:1999 06 1999 INSTALL SYSTEM TO COLLECT SCRAP $11,629 $15,500 n/a
SF0156 # 07 Y:1999 07 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $25,641 $41,432 n/a
OD0125 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,283 $67,670 Implemented
OD0125 # 02 Y:1998 02 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $704 $840 Implemented
OD0125 # 03 Y:1998 03 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,650 $630 Implemented
OD0125 # 04 Y:1998 04 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,182 $8,000 Not Implemented
OD0125 # 05 Y:1998 05 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,293 $1,295 Not Implemented
OD0125 # 06 Y:1998 06 1998 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $619 $0 Implemented
CO0428 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,428 $8,036 Not Implemented
CO0428 # 02 Y:1998 02 1998 DISCONNECT BALLASTS $3,050 $350 Not Implemented
CO0428 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $50 Not Implemented
CO0428 # 04 Y:1998 04 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $500 $1,750 Not Implemented
OR0324 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $300,000 $178,750 Not Implemented
OR0324 # 02 Y:1998 02 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $88,020 $60,000 Not Implemented