IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

929

matching recommendations
Reset
SIC 3086 Plastics Foam Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0100 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $11,663 $4,770 Implemented
MS0100 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,250 $6,500 Implemented
MS0100 # 06 Y:1997 06 1997 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $27,581 $3,182 Implemented
GT0623 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $300 $390 Not Implemented
GT0623 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $111 $120 Not Implemented
GT0623 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $85 $300 Not Implemented
GT0623 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $290 $100 Implemented
GT0623 # 05 Y:1997 05 1997 REDUCE VENTILATION AIR $220 $1,200 Implemented
GT0623 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $429 $1,300 Not Implemented
GT0623 # 07 Y:1997 07 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $765 $0 Not Implemented
GT0623 # 08 Y:1997 08 1997 MOVE PRODUCT USING MECHANICAL MEANS $4,130 $2,500 Implemented
WI0299 # 01 Y:1997 01 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $36,166 $7,000 Not Implemented
WI0299 # 02 Y:1997 02 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,337 $0 Not Implemented
WI0299 # 03 Y:1997 03 1997 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR $16,400 $10,000 Implemented
WI0299 # 04 Y:1997 04 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $15,359 $10,000 Not Implemented
WI0299 # 05 Y:1997 05 1997 INSTALL SYSTEM TO COLLECT SCRAP $8,748 $12,000 Implemented
WI0299 # 06 Y:1997 06 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,439 $16,400 Not Implemented
WI0299 # 07 Y:1997 07 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,424 $500 Implemented
WI0299 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $784 $740 Implemented
NC0109 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,734 $630 Implemented
NC0109 # 02 Y:1997 02 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,491 $650 Not Implemented
NC0109 # 03 Y:1997 03 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,246 $0 Not Implemented
NC0109 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $210 $402 Implemented
NC0109 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,281 $1,200 Implemented
NC0109 # 06 Y:1997 06 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $9,315 $30,000 Not Implemented