IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

941

matching recommendations
Reset
SIC 3086 Plastics Foam Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0299 # 03 Y:1997 03 1997 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR $16,400 $10,000 Implemented
WI0299 # 05 Y:1997 05 1997 INSTALL SYSTEM TO COLLECT SCRAP $8,748 $12,000 Implemented
WI0299 # 06 Y:1997 06 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,439 $16,400 Not Implemented
WI0299 # 07 Y:1997 07 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,424 $500 Implemented
WI0299 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $784 $740 Implemented
WI0299 # 04 Y:1997 04 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $15,359 $10,000 Not Implemented
NC0109 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,734 $630 Implemented
NC0109 # 02 Y:1997 02 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,491 $650 Not Implemented
NC0109 # 03 Y:1997 03 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,246 $0 Not Implemented
NC0109 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $210 $402 Implemented
NC0109 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,281 $1,200 Implemented
NC0109 # 06 Y:1997 06 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $9,315 $30,000 Not Implemented
NC0109 # 07 Y:1997 07 1997 EXPAND OPERATIONS INTO UNUSED SPACE $3,436,000 $2,250,000 Not Implemented
UM0080 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,153 $4,400 Implemented
UM0080 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,925 $22,088 Not Implemented
UM0080 # 03 Y:1997 03 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,401 $250 Implemented
UM0080 # 04 Y:1997 04 1997 INSTALL OCCUPANCY SENSORS $2,603 $1,000 Not Implemented
UM0080 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $257 $800 Not Implemented
UM0080 # 06 Y:1997 06 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $48,048 $0 Implemented
UM0080 # 07 Y:1997 07 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $910 $300 Implemented
SD0163 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,513 $12,290 Implemented
SD0163 # 02 Y:1997 02 1997 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,303 $0 Implemented
SD0163 # 03 Y:1997 03 1997 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $27,336 $4,000 Implemented
SD0163 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,545 $38,000 Implemented
SD0163 # 05 Y:1997 05 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,307 $1,800 Implemented