IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 3087 Custom Compound Purchased Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0294 # 11 Y:2023 11 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $88 $100 Implemented
TT0294 # 10 Y:2023 10 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $974 $500 Implemented
TT0294 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,236 $7,500 Implemented
TT0294 # 06 Y:2023 06 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,671 $500 Implemented
TT0294 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,950 $3,100 Implemented
TT0294 # 03 Y:2023 03 2023 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $14,815 $12,000 Implemented
TT0294 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,944 $43,883 Implemented
TT0294 # 01 Y:2023 01 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $77,940 $2,000 Implemented
TT0285 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $31,920 $13,000 Implemented
TT0285 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $616 $2,793 Implemented
TT0285 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,451 $1,225 Implemented
TT0285 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,293 $3,600 Implemented
TT0165 # 07 Y:2016 07 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $310 $200 Implemented
TT0165 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $883 $1,500 Implemented
TT0165 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $2,310 $1,919 Implemented
TT0165 # 04 Y:2016 04 2016 OPERATE BOILERS ON HIGH FIRE SETTING $4,000 $12,000 Implemented
TT0165 # 03 Y:2016 03 2016 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,033 $3,600 Implemented
TT0165 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,405 $88,306 Implemented
TT0162 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,958 $3,000 Implemented
TT0162 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $19,039 $10,000 Implemented
TN0620 # 01 Y:1997 01 1997 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $475,880 $25,800 Implemented
TN0620 # 08 Y:1997 08 1997 INSULATE BARE EQUIPMENT $1,000 $680 Implemented
TN0620 # 03 Y:1997 03 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $9,000 $17,900 Implemented