Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
132
matching recommendationsSIC | 3088 | Plastics Plumbing Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0354 # 02 Y:2009 | 02 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $17,778 | $8,750 | Implemented |
UM0354 # 07 Y:2009 | 07 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $983 | $200 | Implemented |
UM0354 # 06 Y:2009 | 06 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,114 | $500 | Implemented |
UM0354 # 04 Y:2009 | 04 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,144 | $4,200 | Implemented |
UA0026 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,609 | $4,200 | Implemented |
UA0026 # 01 Y:2008 | 01 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $27,831 | $950 | Implemented |
UA0026 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,048 | $0 | Implemented |
MI0130 # 01 Y:2006 | 01 | 2006 | REDESIGN PROCESS | $7,148 | $580 | Implemented |
MI0130 # 02 Y:2006 | 02 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,958 | $202 | Implemented |
MI0130 # 03 Y:2006 | 03 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,791 | $1,020 | Implemented |
MI0130 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,865 | $1,074 | Implemented |
MI0130 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,895 | $3,800 | Implemented |
SD0361 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $390 | $170 | Implemented |
SD0361 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,570 | $280 | Implemented |
SD0361 # 03 Y:2005 | 03 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,916 | $144 | Implemented |
SD0358 # 05 Y:2005 | 05 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $550 | $1,050 | Implemented |
SD0358 # 08 Y:2005 | 08 | 2005 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $37,125 | $52,500 | Implemented |
SD0358 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,023 | $37,287 | Implemented |
SD0358 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,194 | $360 | Implemented |
SD0357 # 01 Y:2005 | 01 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $416,473 | $750,000 | Implemented |
SD0357 # 05 Y:2005 | 05 | 2005 | AUTOMATE FINISHING PROCESS | $189,416 | $450,000 | Implemented |
SD0357 # 06 Y:2005 | 06 | 2005 | INSTALL SYSTEM TO COLLECT SCRAP | $32,128 | $29,639 | Implemented |
SU0187 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,721 | $10,129 | Implemented |
SU0187 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,502 | $350 | Implemented |
AS0321 # 04 Y:2002 | 04 | 2002 | INSULATE BARE EQUIPMENT | $16,063 | $4,370 | Implemented |