IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,832

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0814 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,857 $4,096 Implemented
WV0589 # 02 Y:2020 02 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $22,091 $28,000 Implemented
WV0589 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $19,827 $15,605 Implemented
WV0589 # 05 Y:2020 05 2020 OPTIMIZE PLANT POWER FACTOR $10,950 $36,000 Implemented
WV0589 # 06 Y:2020 06 2020 UPGRADE CONTROLS ON COMPRESSORS $10,700 $5,225 Implemented
WV0589 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,413 $2,438 Implemented
WV0589 # 08 Y:2020 08 2020 DEVELOP A REPAIR/REPLACE POLICY $2,587 $575 Implemented
WV0589 # 10 Y:2020 10 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,730 $1,251 Implemented
WV0589 # 11 Y:2020 11 2020 INSULATE BARE EQUIPMENT $1,270 $427 Implemented
WV0589 # 12 Y:2020 12 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,181 $75 Implemented
DL0179 # 01 Y:2020 01 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,390 $2,500 Implemented
DL0179 # 03 Y:2020 03 2020 INSTALL TIMERS AND/OR THERMOSTATS $5,600 $600 Implemented
DL0179 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,580 $15,000 Implemented
DL0179 # 06 Y:2020 06 2020 RECOVER WASTE HEAT FROM EQUIPMENT $26,500 $11,625 Implemented
DL0179 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,250 $13,450 Implemented
AM0791 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $282,870 $5,000 Implemented
AM0791 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $56,640 $5,000 Implemented
AM0791 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $40,100 $66,545 Implemented
AM0791 # 06 Y:2019 06 2019 PAY UTILITY BILLS ON TIME $540 $0 Implemented
AM0791 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $335 $8 Implemented
TT0232 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $22,260 $107,529 Implemented
SU0492 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,822 $120 Implemented
SU0492 # 06 Y:2019 06 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $730 $732 Implemented
UK1912 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,541 $0 Implemented
UK1912 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,487 $2,150 Implemented