IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1094 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $573 $870 Implemented
OK1094 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,917 $22,000 Implemented
OK1094 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,890 $94,115 Implemented
OK0934 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $63,243 $3,161 Implemented
OK0934 # 03 Y:2016 03 2016 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $134,039 $1,300 Implemented
OK0908 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $6,429 $11,430 Implemented
OK0908 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $621 $432 Implemented
TT0090 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $134 $525 Implemented
TT0090 # 08 Y:2012 08 2012 DEVELOP A REPAIR/REPLACE POLICY $2,350 $2,400 Implemented
TT0090 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,008 $1,780 Implemented
TT0090 # 04 Y:2012 04 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,764 $2,000 Implemented
TT0090 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $334 $0 Implemented
TT0090 # 03 Y:2012 03 2012 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,275 $1,000 Implemented
LL0266 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,563 $14,000 Implemented
LL0266 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $21,291 $1,905 Implemented
AR0187 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $32 $0 Implemented
AR0187 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $526 $783 Implemented
AR0154 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $49,699 $135,000 Implemented
AR0154 # 03 Y:1998 03 1998 RECOVER AND REUSE COOLING WATER $4,517 $6,800 Implemented
AR0154 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $52,562 $0 Implemented
AR0154 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $99 $207 Implemented
AR0095 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,524 $160 Implemented
AR0095 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,185 $1,006 Implemented
AR0095 # 07 Y:1996 07 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,175 $1,008 Implemented
AR0095 # 09 Y:1996 09 1996 MAINTAIN MACHINES TO REDUCE LEAKS $1,314 $900 Implemented