Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0382 # 12 Y:2004 | 12 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,219 | $1,125 | Implemented |
AS0382 # 11 Y:2004 | 11 | 2004 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $4,650 | $36,448 | Implemented |
AS0382 # 10 Y:2004 | 10 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,540 | $3,735 | Implemented |
AS0382 # 09 Y:2004 | 09 | 2004 | INSTALL AUTOMATIC PACKING EQUIPMENT | $128,880 | $850 | Implemented |
AS0382 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $44,391 | $50 | Implemented |
AS0382 # 02 Y:2004 | 02 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,403 | $240 | Implemented |
AS0382 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $743 | $6,446 | Implemented |
AS0382 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $736 | $128,880 | Implemented |
AS0382 # 05 Y:2004 | 05 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,254 | $4,200 | Implemented |
AS0382 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $516 | $1,697 | Implemented |
AS0382 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $17,174 | $840 | Implemented |
AS0382 # 08 Y:2004 | 08 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $6,306 | $300 | Implemented |
AS0352 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,619 | $120 | Implemented |
AS0352 # 07 Y:2003 | 07 | 2003 | CLEAR AND RENT EXISTING SPACE | $12,132 | $9,260 | Implemented |
AS0352 # 06 Y:2003 | 06 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $29,631 | $1,380 | Implemented |
AS0352 # 05 Y:2003 | 05 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $194 | $0 | Implemented |
AS0352 # 02 Y:2003 | 02 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $402 | $1,000 | Implemented |
NV0112 # 07 Y:1998 | 07 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,560 | $0 | Implemented |
NV0105 # 10 Y:1998 | 10 | 1998 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $52,000 | $14,200 | Implemented |
NV0105 # 02 Y:1998 | 02 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $9,271 | $21,600 | Implemented |
NV0105 # 05 Y:1998 | 05 | 1998 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $9,488 | $1,080 | Implemented |
NV0105 # 09 Y:1998 | 09 | 1998 | USE RADIANT HEATER FOR SPOT HEATING | $2,679 | $8,064 | Implemented |
NV0105 # 03 Y:1998 | 03 | 1998 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,061 | $0 | Implemented |
NV0105 # 12 Y:1998 | 12 | 1998 | REDUCE SCRAP PRODUCTION | $64,064 | $375,750 | Implemented |
NV0105 # 04 Y:1998 | 04 | 1998 | SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE | $1,030 | $1,267 | Implemented |