IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0131 # 07 Y:1999 07 1999 $6,408 $3,978 Implemented
BD0129 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,778 $600 Implemented
BD0129 # 05 Y:1999 05 1999 INSTALL OCCUPANCY SENSORS $2,092 $1,350 Implemented
BD0129 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $548 $560 Implemented
BD0129 # 09 Y:1999 09 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,143 $250 Implemented
UM0135 # 01 Y:1999 01 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,898 $20,000 Implemented
UM0135 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,690 $50 Implemented
UM0135 # 04 Y:1999 04 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,660 $2,500 Implemented
UM0135 # 05 Y:1999 05 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $986 $1,500 Implemented
UM0135 # 06 Y:1999 06 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $735 $100 Implemented
HO0196 # 03 Y:1999 03 1999 $2,000 $500 Implemented
HO0196 # 05 Y:1999 05 1999 $3,000 $300 Implemented
UM0132 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,280 $7,301 Implemented
UM0132 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $680 $700 Implemented
UM0132 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $667 $300 Implemented
UM0132 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $349 $1,000 Implemented
UM0132 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $815 $990 Implemented
UM0132 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,503 $3,700 Implemented
UM0132 # 07 Y:1999 07 1999 USE LOW VOC OR WATER BASED PAINT $5,439 $500 Implemented
SD0212 # 04 Y:1999 04 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,696 $0 Implemented
SD0212 # 05 Y:1999 05 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $2,440 $3,840 Implemented
SD0212 # 07 Y:1999 07 1999 INSTALL SET-BACK TIMERS $2,140 $1,000 Implemented
SD0212 # 09 Y:1999 09 1999 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,166 $0 Implemented
MA0432 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,201 $18,690 Implemented
MA0432 # 03 Y:1999 03 1999 USE RADIANT HEATER FOR SPOT HEATING $6,592 $40,000 Implemented