IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

990

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0357 # 11 Y:2007 11 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $630 $0 Not Implemented
WV0357 # 12 Y:2007 12 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $581 $125 Implemented
WV0357 # 13 Y:2007 13 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $546 $25 Implemented
UM0310 # 01 Y:2006 01 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $31,460 $21,337 Not Implemented
UM0310 # 02 Y:2006 02 2006 INSTALL SOLID WASTE INCINERATOR FOR HEAT $30,322 $27,325 Not Implemented
UM0310 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,000 $14,850 Implemented
UM0310 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,978 $375 Implemented
UM0310 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,694 $2,000 Not Implemented
UM0310 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,785 $5,996 Implemented
UM0310 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,854 $225 Implemented
WV0337 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,554 $123,600 Implemented
WV0337 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $5,455 $800 Implemented
WV0337 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $5,170 $2,156 Implemented
WV0337 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,690 $0 Implemented
WV0337 # 05 Y:2006 05 2006 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,170 $2,350 Not Implemented
WV0337 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $2,233 $760 Implemented
WV0337 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,082 $590 Implemented
WV0337 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,981 $80 Implemented
WV0337 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,846 $2,185 Not Implemented
WV0337 # 10 Y:2006 10 2006 USE SYNTHETIC LUBRICANT $1,777 $0 Implemented
WV0337 # 11 Y:2006 11 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,749 $2,400 Not Implemented
WV0337 # 12 Y:2006 12 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,100 $1,308 Not Implemented
WV0337 # 13 Y:2006 13 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $674 $1,280 Implemented
WV0336 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,594 $14,968 Implemented
WV0336 # 02 Y:2006 02 2006 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $14,092 $25,000 Not Implemented