IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,727

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0589 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,077 $4,500 Not Implemented
WI0366 # 01 Y:2000 01 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $23,840 $71,500 Not Implemented
WI0366 # 02 Y:2000 02 2000 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $23,087 $0 Not Implemented
WI0366 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,458 $3,013 Not Implemented
WI0366 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,884 $0 Not Implemented
WI0366 # 05 Y:2000 05 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,628 $6,060 Not Implemented
WI0366 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,996 $4,934 Not Implemented
WI0366 # 07 Y:2000 07 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,500 $0 Not Implemented
MA0455 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $93,496 $240,000 Not Implemented
MA0455 # 02 Y:1999 02 1999 USE MINIMUM SAFE OVEN VENTILATION $33,134 $16,250 Not Implemented
MA0455 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,310 $50,000 Not Implemented
MA0455 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,701 $16,000 Not Implemented
MA0455 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,122 $8,000 Not Implemented
MS0146 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $2,236 $2,610 Not Implemented
MS0146 # 02 Y:1999 02 1999 INSTALL TIMERS AND/OR THERMOSTATS $50 $119 Implemented
MS0146 # 03 Y:1999 03 1999 USE PHOTOCELL CONTROLS $276 $222 Not Implemented
MS0146 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $635 $89 Not Implemented
MS0146 # 05 Y:1999 05 1999 INSTALL OCCUPANCY SENSORS $192 $346 Not Implemented
MS0146 # 06 Y:1999 06 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,736 $4,200 Not Implemented
MS0146 # 07 Y:1999 07 1999 INSULATE BARE EQUIPMENT $2,189 $2,446 Not Implemented
MS0146 # 08 Y:1999 08 1999 USE RE-USABLE FILTERS $4,800 $648 Implemented
MS0146 # 09 Y:1999 09 1999 PAY BILLS ON TIME TO AVOID LATE FEES $16 $0 Implemented
MS0146 # 10 Y:1999 10 1999 INSTALL SYSTEM TO COLLECT SCRAP $4,000 $5,246 Implemented
MA0454 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,113 $11,700 Not Implemented
MA0454 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $5,776 $16,250 Not Implemented