IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

837

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0226 # 10 Y:1999 10 1999 CONVERT TO AQUEOUS CLEANING $1,362 $0 Not Implemented
SD0226 # 11 Y:1999 11 1999 MAINTAIN MACHINES TO REDUCE LEAKS $1,103 $385 Implemented
SD0226 # 12 Y:1999 12 1999 INSTALL BACK-UP EQUIPMENT $1,728 $0 Not Implemented
SF0165 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $535 $889 n/a
SF0165 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,152 $14,840 n/a
SF0165 # 03 Y:1999 03 1999 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $491 $1,250 n/a
SF0165 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,333 $51,850 n/a
SF0165 # 05 Y:1999 05 1999 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $726 $0 n/a
SF0165 # 06 Y:1999 06 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $30,000 $2,773 n/a
SD0212 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $896 $0 Not Implemented
SD0212 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,608 $16,000 Not Implemented
SD0212 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $51,749 $13,000 Not Implemented
SD0212 # 04 Y:1999 04 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,696 $0 Implemented
SD0212 # 05 Y:1999 05 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $2,440 $3,840 Implemented
SD0212 # 06 Y:1999 06 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $990 $0 Not Implemented
SD0212 # 07 Y:1999 07 1999 INSTALL SET-BACK TIMERS $2,140 $1,000 Implemented
SD0212 # 08 Y:1999 08 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,550 $8,500 Not Implemented
SD0212 # 09 Y:1999 09 1999 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,166 $0 Implemented
SD0212 # 10 Y:1999 10 1999 LEASE EQUIPMENT INSTEAD OF PURCHASING $40,000 $0 Not Implemented
SD0206 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $83,038 $163,750 Not Implemented
SD0206 # 02 Y:1998 02 1998 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $5,837 $0 Implemented
SD0206 # 03 Y:1998 03 1998 USE OPTIMUM THICKNESS INSULATION $2,817 $1,076 Implemented
SD0206 # 04 Y:1998 04 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $519 $1,260 Implemented
SD0206 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,374 $0 Implemented
SD0206 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,218 $8,500 Implemented