IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,727

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0158 # 07 Y:1997 07 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,000 $2,000 Not Implemented
UL0181 # 01 Y:1997 01 1997 UPGRADE OBSOLETE EQUIPMENT $139 $0 Not Implemented
UL0181 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $350 $8,500 Not Implemented
UL0181 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $3,388 $786 Not Implemented
UL0181 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $415 $263 Not Implemented
UL0181 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $476 $3,157 Not Implemented
UL0181 # 06 Y:1997 06 1997 REGENERATE CLEANING SOLVENT ON-SITE AND REUSE $19,550 $56,265 Not Implemented
UL0181 # 07 Y:1997 07 1997 USE ABSORPTION, EXTRACTION TO REMOVE CONTAMINANTS $5,165 $60 Not Implemented
TN0612 # 01 Y:1997 01 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $65,520 $36,000 Not Implemented
TN0612 # 02 Y:1997 02 1997 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,210 $0 Not Implemented
TN0612 # 03 Y:1997 03 1997 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $2,004 $0 Implemented
TN0612 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,990 $0 Not Implemented
TN0612 # 05 Y:1997 05 1997 METER WASTE WATER $660 $235 Not Implemented
TN0612 # 06 Y:1997 06 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $600 $220 Implemented
TN0612 # 07 Y:1997 07 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $250 $650 Not Implemented
OD0083 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,624 $1,487 n/a
OD0083 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,747 $5,202 n/a
OD0083 # 03 Y:1997 03 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,031 $2,091 n/a
OD0083 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $12,028 $5,691 n/a
OD0083 # 05 Y:1997 05 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $500,032 $30,482 n/a
MA0390 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,319 $11,700 Not Implemented
MA0390 # 02 Y:1997 02 1997 PAY BILLS ON TIME TO AVOID LATE FEES $5,709 $0 Not Implemented
MA0390 # 03 Y:1997 03 1997 OPTIMIZE PLANT POWER FACTOR $4,435 $9,975 Not Implemented
MA0390 # 04 Y:1997 04 1997 CHECK FOR ACCURACY OF UTILITY / POWER METERS $3,585 $480 Not Implemented
MA0390 # 05 Y:1997 05 1997 INSTALL OCCUPANCY SENSORS $852 $999 Not Implemented