IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

990

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0602 # 02 Y:2000 02 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $91,844 $0 Not Implemented
UD0602 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,455 $31,020 Not Implemented
UD0602 # 04 Y:2000 04 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,807 $7,600 Not Implemented
WV0197 # 01 Y:2000 01 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $286 $50 Implemented
WV0197 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $813 $23 Implemented
WV0197 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,257 $242 Not Implemented
WV0197 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $669 $610 Implemented
WV0197 # 05 Y:2000 05 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,365 $920 Implemented
WV0197 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,583 $15,828 Not Implemented
WV0197 # 07 Y:2000 07 2000 BURN WASTE OIL FOR HEAT $28,800 $1,579 Not Implemented
WV0197 # 08 Y:2000 08 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $7,200 $200 Not Implemented
WV0197 # 09 Y:2000 09 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,000 $9,800 Not Implemented
WV0196 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $321 $80 Implemented
WV0196 # 02 Y:2000 02 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,521 $3,970 Not Implemented
WV0196 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $11,584 $699 Implemented
WV0196 # 04 Y:2000 04 2000 USE OPTIMUM THICKNESS INSULATION $264 $298 Implemented
WV0196 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,981 $688 Implemented
WV0196 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $745 $432 Not Implemented
WV0196 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $950 $20 Implemented
WV0196 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $401 Implemented
WV0196 # 09 Y:2000 09 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,040 $150 Implemented
WV0196 # 10 Y:2000 10 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $2,000 $658 Not Implemented
WV0196 # 11 Y:2000 11 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,000 $275 Not Implemented
UD0589 # 01 Y:2000 01 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $240,319 $400,000 Not Implemented
UD0589 # 02 Y:2000 02 2000 EXPAND OPERATIONS INTO UNUSED SPACE $35,731 $0 Not Implemented