IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0600 # 05 Y:2012 05 2012 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES $4,720 $0 Not Implemented
OR0600 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $334 $0 Implemented
OR0600 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,704 $500 Implemented
OR0600 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $940 $392 Implemented
OR0600 # 06 Y:2012 06 2012 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $6,653 $385 Implemented
OR0600 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,399 $560 Implemented
OR0600 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,835 $2,724 Implemented
OR0600 # 01 Y:2012 01 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,559 $2,500 Not Implemented
OR0585 # 10 Y:2012 10 2012 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,580 $0 Not Implemented
OR0585 # 11 Y:2012 11 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $12,086 $16,390 Implemented
OR0585 # 09 Y:2012 09 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $7,083 $47,838 Not Implemented
OR0585 # 08 Y:2012 08 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $16,379 $16,379 Not Implemented
OR0585 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $13,449 $24,282 Not Implemented
OR0585 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,942 $1,000 Not Implemented
OR0585 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,171 $1,000 Not Implemented
OR0585 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,028 $2,305 Implemented
OR0585 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $1,776 $500 Not Implemented
OR0585 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,690 $2,000 Not Implemented
OR0585 # 01 Y:2012 01 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,836 $7,417 Not Implemented
OR0460 # 03 Y:2004 03 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $16,000 $0 Implemented
OR0460 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,070 $1,830 Implemented
OR0460 # 05 Y:2004 05 2004 MOVE PRODUCT USING MECHANICAL MEANS $7,850 $2,320 Implemented
OR0460 # 04 Y:2004 04 2004 INSTALL EQUIPMENT TO MOVE PRODUCT $37,500 $14,200 Not Implemented
OR0460 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $1,500 Implemented
OR0307 # 07 Y:1997 07 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,433 $2,240 n/a