IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

378

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0212 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,802 $100 n/a
UL0212 # 02 Y:1998 02 1998 OPTIMIZE PLANT POWER FACTOR $3,040 $2,176 n/a
UL0212 # 04 Y:1998 04 1998 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $1,567 $5,070 n/a
UL0212 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $26,000 $3,120 n/a
UL0212 # 03 Y:1998 03 1998 MINIMIZE USE OF RAGS THROUGH WORKER TRAINING $3,175 $1,625 n/a
HO0175 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,263 $16,755 Implemented
HO0175 # 05 Y:1998 05 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $9,375 $0 Implemented
HO0175 # 06 Y:1998 06 1998 CLEAR AND RENT EXISTING SPACE $18,000 $3,000 Implemented
HO0175 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $3,201 $168 Implemented
HO0175 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $320 $500 Not Implemented
HO0175 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $800 $300 Implemented
AS0240 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,167 $9,143 Not Implemented
AS0240 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,896 $60 Implemented
AS0240 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,175 $8,691 Implemented
AS0240 # 08 Y:1998 08 1998 MODIFY STARTUP/SHUTDOWN TIMES $41,874 $2,680 Not Implemented
AS0240 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $4,646 $30 Implemented
AS0240 # 07 Y:1998 07 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $37,961 $240 Not Implemented
AS0240 # 02 Y:1998 02 1998 INSTALL SKYLIGHTS $2,417 $7,500 Not Implemented
AS0240 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,086 $3,800 Implemented
UL0206 # 04 Y:1998 04 1998 AUTOMATE FINISHING PROCESS $128,880 $0 Not Implemented
UL0206 # 03 Y:1998 03 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $28,180 $0 Implemented
AR0154 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $99 $207 Implemented
AR0154 # 04 Y:1998 04 1998 INSTALL EQUIPMENT TO MOVE PRODUCT $210,246 $35,000 Not Implemented
AR0154 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $52,562 $0 Implemented
UL0206 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $67,516 $0 Implemented