Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
303
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0560 # 07 Y:2004 | 07 | 2004 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $650 | $0 | Not Implemented |
CO0560 # 10 Y:2004 | 10 | 2004 | INSTALL SKYLIGHTS | $4,950 | $30,000 | Not Implemented |
CO0560 # 08 Y:2004 | 08 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $530 | $0 | Implemented |
CO0560 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,230 | $130 | Implemented |
CO0560 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $370 | $1,180 | Implemented |
CO0560 # 06 Y:2004 | 06 | 2004 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $990 | $800 | Not Implemented |
CO0560 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,390 | $15,681 | Implemented |
CO0560 # 09 Y:2004 | 09 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,800 | $10,610 | Not Implemented |
CO0560 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,520 | $160 | Implemented |
CO0560 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,190 | $17,400 | Not Implemented |
CO0560 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $654 | $944 | Implemented |
CO0560 # 04 Y:2004 | 04 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,210 | $0 | Not Implemented |
IA0357 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,225 | $349 | Implemented |
IA0357 # 07 Y:2004 | 07 | 2004 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $206,874 | $145,850 | Implemented |
IA0357 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $447 | $654 | Implemented |
IA0357 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,027 | $23 | Implemented |
IA0357 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $657 | $262 | Implemented |
IA0357 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,125 | $25 | Not Implemented |
IA0357 # 01 Y:2004 | 01 | 2004 | OPTIMIZE PLANT POWER FACTOR | $1,879 | $2,445 | Implemented |
OR0473 # 04 Y:2004 | 04 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,530 | $2,200 | Implemented |
OR0473 # 05 Y:2004 | 05 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $1,100 | $4,000 | Not Implemented |
OR0473 # 01 Y:2004 | 01 | 2004 | INSTALL AUTOMATIC PACKING EQUIPMENT | $7,000 | $7,000 | Implemented |
OR0473 # 02 Y:2004 | 02 | 2004 | OPTIMIZE PLANT POWER FACTOR | $7,400 | $7,400 | Not Implemented |
OR0473 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,500 | $1,500 | Implemented |
SD0353 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,343 | $2,475 | Not Implemented |