IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0410 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,826 $81,570 Not Implemented
LE0276 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $12,548 $600 Not Implemented
LE0276 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,479 $53,518 Not Implemented
LE0276 # 07 Y:2008 07 2008 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,838 $3,600 Not Implemented
LE0276 # 06 Y:2008 06 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,749 $16,800 Not Implemented
LE0276 # 05 Y:2008 05 2008 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $15,550 $500 Not Implemented
LE0276 # 04 Y:2008 04 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,230 $16,000 Implemented
LE0276 # 03 Y:2008 03 2008 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $38,127 $30,600 Not Implemented
LE0276 # 02 Y:2008 02 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $55,360 $30,000 Not Implemented
LE0276 # 01 Y:2008 01 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $144,000 $92,000 Implemented
IC0144 # 10 Y:2008 10 2008 USE SOLAR HEAT TO HEAT WATER $305 $1,965 Not Implemented
IC0144 # 13 Y:2008 13 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $633 $920 Implemented
IC0144 # 12 Y:2008 12 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $48 $0 Implemented
IC0144 # 11 Y:2008 11 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $307 $0 Not Implemented
IC0144 # 09 Y:2008 09 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $222 $0 Implemented
IC0144 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $431 $0 Not Implemented
IC0144 # 07 Y:2008 07 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,002 $2,000 Implemented
IC0144 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,031 $4,364 Implemented
IC0144 # 05 Y:2008 05 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $68 $0 Implemented
IC0144 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $533 $781 Implemented
IC0144 # 03 Y:2008 03 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $461 $0 Implemented
IC0144 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,224 $5,101 Implemented
IC0144 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,363 $12,122 Not Implemented
IC0143 # 13 Y:2008 13 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $195 $0 Not Implemented
IC0143 # 11 Y:2008 11 2008 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,202 $32,361 Implemented