IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,641

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0050 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,142 $0 Implemented
AS0050 # 07 Y:1992 07 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $200 Implemented
AS0050 # 10 Y:1992 10 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $514 $5,315 Implemented
AS0050 # 11 Y:1992 11 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,018 $2,410 Implemented
AS0050 # 12 Y:1992 12 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,148 $5,040 Implemented
AS0050 # 13 Y:1992 13 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $460 $70 Implemented
AM0138 # 01 Y:1992 01 1992 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $132,770 $1,000,000 Implemented
AM0138 # 02 Y:1992 02 1992 OPTIMIZE PLANT POWER FACTOR $2,460 $640 Implemented
AM0138 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $940 $0 Implemented
AM0138 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,147 $2,720 Implemented
UD0354 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $12,118 $4,375 Implemented
UD0354 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,516 $0 Implemented
UD0354 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,096 $0 Implemented
UD0354 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $3,907 $0 Implemented
UD0354 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $1,636 $0 Implemented
UD0352 # 01 Y:1991 01 1991 RECOVER WASTE HEAT FROM EQUIPMENT $593 $1,000 Implemented
UD0352 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,167 $1,500 Implemented
UD0352 # 03 Y:1991 03 1991 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,569 $75,000 Implemented
KU0345 # 02 Y:1991 02 1991 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $3,220 $1,500 Implemented
KU0345 # 03 Y:1991 03 1991 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,154 $2,200 Implemented
KU0345 # 04 Y:1991 04 1991 REDUCE VENTILATION AIR $1,505 $200 Implemented
KU0345 # 05 Y:1991 05 1991 USE OPTIMUM THICKNESS INSULATION $374 $600 Implemented
KU0345 # 06 Y:1991 06 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,461 $5,300 Implemented
KU0345 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $618 $950 Implemented
KU0345 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $715 $300 Implemented