Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
77
matching recommendationsSIC | 32 | Stone, Clay, And Glass Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0042 # 06 Y:1992 | 06 | 1992 | INSTALL SET-BACK TIMERS | $3,181 | $2,376 | Implemented |
IA0042 # 01 Y:1992 | 01 | 1992 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $25,018 | $6,000 | Implemented |
UD0390 # 02 Y:1992 | 02 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $2,033 | $300 | Implemented |
UD0390 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $760 | $2,000 | Implemented |
IA0042 # 03 Y:1992 | 03 | 1992 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $939 | $250 | Implemented |
IA0042 # 05 Y:1992 | 05 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,328 | $150 | Implemented |
IA0042 # 08 Y:1992 | 08 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $241 | $185 | Implemented |
SD0037 # 06 Y:1992 | 06 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $566 | $20 | Implemented |
SD0037 # 08 Y:1992 | 08 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,977 | $1,740 | Implemented |
SD0037 # 01 Y:1992 | 01 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $943 | $4,020 | Implemented |
OR0163 # 01 Y:1992 | 01 | 1992 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,055 | $0 | Implemented |
OR0163 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $349 | $0 | Implemented |
OR0163 # 04 Y:1992 | 04 | 1992 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $676 | $1,436 | Implemented |
OR0163 # 03 Y:1992 | 03 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,260 | $4,000 | Implemented |
OR0163 # 02 Y:1992 | 02 | 1992 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,832 | $360 | Implemented |
GT0468 # 03 Y:1992 | 03 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $17,240 | $0 | Implemented |
GT0468 # 02 Y:1992 | 02 | 1992 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $7,368 | $3,500 | Implemented |
AS0061 # 09 Y:1992 | 09 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,933 | $2,000 | Implemented |
AS0061 # 08 Y:1992 | 08 | 1992 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $129,176 | $640,000 | Implemented |
AS0061 # 07 Y:1992 | 07 | 1992 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $107,027 | $6,700 | Implemented |
AS0061 # 06 Y:1992 | 06 | 1992 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $236,795 | $750,000 | Implemented |
AS0061 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,446 | $3,248 | Implemented |
AS0061 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,583 | $8,109 | Implemented |
AS0061 # 02 Y:1992 | 02 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $345,320 | $530,000 | Implemented |
AS0061 # 01 Y:1992 | 01 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,012 | $24,872 | Implemented |