IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0558 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,660 $7,410 Implemented
CO0558 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $234 $588 Implemented
CO0558 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,020 $6,030 Implemented
CO0558 # 02 Y:2004 02 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,700 $2,720 Implemented
CO0558 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,990 $350 Implemented
UU0078 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,970 $400 Implemented
UU0078 # 08 Y:2004 08 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $810 $450 Implemented
UU0078 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,890 $4,820 Implemented
UU0078 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,465 $405 Implemented
SF0296 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,781 $4,375 Implemented
SF0296 # 09 Y:2004 09 2004 USE PHOTOCELL CONTROLS $1,017 $3,059 Implemented
SF0296 # 07 Y:2004 07 2004 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $753 $1,520 Implemented
SF0296 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,715 $2,638 Implemented
SF0296 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $850 $282 Implemented
SD0351 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,754 $39,050 Implemented
SD0351 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $663 $0 Implemented
SD0351 # 02 Y:2004 02 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $80,766 $255,442 Implemented
SD0351 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,248 $14,785 Implemented
SD0351 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,257 $350 Implemented
SD0351 # 07 Y:2004 07 2004 PAY UTILITY BILLS ON TIME $1,391 $0 Implemented
BD0269 # 07 Y:2004 07 2004 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,363 $340 Implemented
BD0269 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,736 $0 Implemented
BD0269 # 04 Y:2004 04 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,160 $5,500 Implemented
BD0269 # 03 Y:2004 03 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,822 $1,400 Implemented
BD0269 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,601 $731 Implemented