IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,698

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0042 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,478 $9,905 Not Implemented
IA0042 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,328 $150 Implemented
IA0042 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $3,181 $2,376 Implemented
IA0042 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $619 $1,575 Not Implemented
IA0042 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $241 $185 Implemented
SD0037 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $943 $4,020 Implemented
SD0037 # 02 Y:1992 02 1992 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $64,662 $30,000 Not Implemented
SD0037 # 03 Y:1992 03 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,542 $5,000 Not Implemented
SD0037 # 04 Y:1992 04 1992 INSULATE BARE EQUIPMENT $2,021 $1,042 Not Implemented
SD0037 # 05 Y:1992 05 1992 INSULATE BARE EQUIPMENT $2,584 $1,277 Not Implemented
SD0037 # 06 Y:1992 06 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $566 $20 Implemented
SD0037 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,110 $2,205 Not Implemented
SD0037 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,977 $1,740 Implemented
SD0037 # 09 Y:1992 09 1992 KEEP LAMPS AND REFLECTORS CLEAN $8,215 $13,350 Not Implemented
SD0037 # 10 Y:1992 10 1992 INSTALL SET-BACK TIMERS $3,085 $2,867 Not Implemented
SD0037 # 11 Y:1992 11 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,314 $2,420 Not Implemented
OR0163 # 01 Y:1992 01 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,055 $0 Implemented
OR0163 # 02 Y:1992 02 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,832 $360 Implemented
OR0163 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,260 $4,000 Implemented
OR0163 # 04 Y:1992 04 1992 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $676 $1,436 Implemented
OR0163 # 05 Y:1992 05 1992 RECOVER MECHANICAL ENERGY $300 $850 Not Implemented
OR0163 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $0 Implemented
AS0061 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,012 $24,872 Implemented
AS0061 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $345,320 $530,000 Implemented
AS0061 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,583 $8,109 Implemented