IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 32 Stone, Clay, And Glass Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0556 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,806 $5,000 Not Implemented
NC0556 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,438 $12,000 Implemented
NC0556 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $9,076 $3,200 Not Implemented
NC0556 # 05 Y:2015 05 2015 DEVELOP A REPAIR/REPLACE POLICY $1,836 $4,256 Implemented
NC0556 # 06 Y:2015 06 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,228 $200 Not Implemented
NC0556 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,584 $8,350 Implemented
NC0556 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $578 $868 Implemented
NC0556 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $59,808 $90,000 Implemented
NC0447 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,190 $399 Not Implemented
NC0447 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,779 $84,121 Not Implemented
NC0447 # 04 Y:2012 04 2012 INSULATE FEEDWATER TANK $339 $1,133 Not Implemented
NC0447 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,895 $400 Implemented
NC0447 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $17,983 $2,000 Not Implemented
NC0447 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,468 $500 Implemented
NC0278 # 06 Y:2004 06 2004 USE PHOTOCELL CONTROLS $72 $130 Implemented
NC0278 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $574 $25 Implemented
NC0278 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,132 $630 Not Implemented
NC0278 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $47 $25 Implemented
NC0278 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $458 $1,750 Not Implemented
NC0278 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,343 $18,000 n/a
NC0208 # 01 Y:2001 01 2001 USE OPTIMUM THICKNESS INSULATION $2,937 $4,950 Not Implemented
NC0208 # 02 Y:2001 02 2001 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $45,000 $21,500 Not Implemented
NC0208 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $151 $2,700 Implemented
NC0208 # 04 Y:2001 04 2001 USE PHOTOCELL CONTROLS $113 $200 Implemented
NC0208 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $792 $100 Implemented