IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

126

matching recommendations
Reset
SIC 321 Flat Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0588 # 02 Y:2025 02 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,235 $100 Implemented
LE0588 # 07 Y:2025 07 2025 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $175,084 $635,000 Implemented
LE0588 # 08 Y:2025 08 2025 INSTALL OCCUPANCY SENSORS $38 $140 Implemented
LE0588 # 01 Y:2025 01 2025 PAY UTILITY BILLS ON TIME $1,523 $0 Implemented
LE0588 # 05 Y:2025 05 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $25,169 $56,274 Implemented
LE0588 # 06 Y:2025 06 2025 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $938 $2,500 Implemented
LE0588 # 04 Y:2025 04 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,600 $26,934 Implemented
LE0588 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,412 $1,256 Implemented
OK1096 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $394,679 $75,000 Implemented
OK1096 # 08 Y:2023 08 2023 MAINTAIN MACHINES TO REDUCE LEAKS $2,796 $500 Implemented
OK1096 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,791 $464,597 Implemented
OK1096 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,865 $10,337 Implemented
OK1096 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $593 $1,354 Implemented
SD0618 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,155 $300 Implemented
WV0613 # 02 Y:2021 02 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,135 $10,700 Implemented
WV0613 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $536 $96 Implemented
WV0613 # 08 Y:2021 08 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $177 $40 Implemented
WV0613 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $10,812 $30,758 Implemented
WV0613 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $2,061 $3,373 Implemented
LE0510 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,170 $21,000 Implemented
LE0510 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,899 $12,800 Implemented
LE0510 # 08 Y:2021 08 2021 REPLACE BOILER $334,294 $1,800,000 Implemented
LE0510 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,951 $30,000 Implemented
LE0510 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,926 $45,000 Implemented
LE0510 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,017 $17,100 Implemented