Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
266
matching recommendationsSIC | 321 | Flat Glass |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0634 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $25,314 | $6,300 | n/a |
SF0634 # 05 Y:2025 | 05 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,706 | $2,070 | n/a |
SF0634 # 04 Y:2025 | 04 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $55,964 | $17,866 | n/a |
SF0634 # 02 Y:2025 | 02 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,091 | $0 | n/a |
SF0634 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,190 | $0 | n/a |
SF0634 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,362 | $8,453 | n/a |
SF0634 # 08 Y:2025 | 08 | 2025 | HEAT WATER WITH EXHAUST HEAT | $9,559 | $18,756 | n/a |
SF0634 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,856 | $6,881 | n/a |
SF0634 # 09 Y:2025 | 09 | 2025 | USE PHOTOCELL CONTROLS | $585 | $1,248 | n/a |
LE0588 # 04 Y:2025 | 04 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,600 | $26,934 | n/a |
LE0588 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $38 | $140 | n/a |
LE0588 # 07 Y:2025 | 07 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $175,084 | $635,000 | n/a |
LE0588 # 05 Y:2025 | 05 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $25,169 | $56,274 | n/a |
LE0588 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,412 | $1,256 | n/a |
LE0588 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,235 | $100 | n/a |
LE0588 # 01 Y:2025 | 01 | 2025 | PAY UTILITY BILLS ON TIME | $1,523 | $0 | n/a |
LE0588 # 06 Y:2025 | 06 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $938 | $2,500 | n/a |
OR0774 # 02 Y:2023 | 02 | 2023 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $22,803 | $17,436 | Not Implemented |
OR0774 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $27,206 | $88,913 | Not Implemented |
OR0774 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,255 | $1,480 | Not Implemented |
OR0774 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $10,951 | $10,710 | Not Implemented |
OK1096 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $96,791 | $464,597 | Implemented |
OK1096 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,865 | $10,337 | Implemented |
OK1096 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES | $394,679 | $75,000 | Implemented |
OK1096 # 08 Y:2023 | 08 | 2023 | MAINTAIN MACHINES TO REDUCE LEAKS | $2,796 | $500 | Implemented |