IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
SIC 3221 Glass Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0981 # 06 Y:2018 06 2018 OPTIMIZE PLANT POWER FACTOR $11,423 $50,570 Not Implemented
OK0981 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,309 $4,937 Not Implemented
OK0981 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,343 $69,050 Not Implemented
OK0981 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,815 $0 Not Implemented
OK0981 # 01 Y:2018 01 2018 UPGRADE CONTROLS ON COMPRESSORS $124,716 $75,000 Implemented
OK0981 # 05 Y:2018 05 2018 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $353,111 $2,500,000 Not Implemented
DL0169 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $300,500 $1,937,040 Not Implemented
DL0169 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $11,160 $11,160 Not Implemented
DL0169 # 04 Y:2016 04 2016 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $5,060 $5,000 Not Implemented
DL0169 # 03 Y:2016 03 2016 ADJUST BURNERS FOR EFFICIENT OPERATION $117,000 $34,000 Not Implemented
DL0169 # 02 Y:2016 02 2016 KEEP EQUIPMENT CLEAN $13,120 $2,500 Implemented
DL0169 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $163,600 $12,000 Not Implemented
LE0396 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $702 $35 Implemented
LE0396 # 05 Y:2015 05 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,534 $1,644 Implemented
LE0396 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,080 $2,845 Implemented
LE0396 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,655 $4,000 Not Implemented
LE0396 # 10 Y:2015 10 2015 REPLACE BOILER $4,068 $18,400 Not Implemented
LE0396 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,431 $13,983 Not Implemented
LE0396 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $405 $1,000 Implemented
LE0396 # 06 Y:2015 06 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,473 $1,950 Not Implemented
LE0396 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,304 $9,400 Not Implemented
LE0396 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $214 $105 Implemented
MZ0145 # 08 Y:2014 08 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,868 $0 Implemented
MZ0145 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,268 $0 Implemented
MZ0145 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,814 $30,000 Implemented