Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3231 Products Of Purchased Glass
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0615 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,960 $1,500 Implemented
CO0615 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $6,490 $1,000 Implemented
CO0611 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,360 $20,290 Implemented
CO0611 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $500 $1,755 Implemented
CO0611 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $200 Implemented
CO0558 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,660 $7,410 Implemented
CO0558 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $234 $588 Implemented
CO0558 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,020 $6,030 Implemented
CO0558 # 02 Y:2004 02 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,700 $2,720 Implemented
CO0558 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,990 $350 Implemented
CO0460 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $72,730 $122,000 Implemented
CO0460 # 08 Y:2000 08 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $166,400 $40,000 Implemented
CO0460 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $200 $210 Implemented
CO0460 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $240 $600 Implemented
CO0460 # 04 Y:2000 04 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $430 $670 Implemented
CO0460 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,940 $7,500 Implemented
CO0406 # 03 Y:1998 03 1998 REDUCE SCRAP PRODUCTION $1,470 $500 Implemented
CO0406 # 01 Y:1998 01 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $5,100 $1,550 Implemented
CO0023 # 03 Y:1985 03 1985 RECOVER WASTE HEAT FROM EQUIPMENT $6,891 $5,000 Implemented
CO0023 # 07 Y:1985 07 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,364 $100 Implemented
CO0023 # 04 Y:1985 04 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,690 $375 Implemented