Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163
matching recommendationsSIC | 324 | Cement, Hydraulic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW0042 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $702,459 | $5,700,000 | Not Implemented |
UW0042 # 02 Y:2010 | 02 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $26,153 | $26,153 | Not Implemented |
UW0042 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,225 | $81,585 | Implemented |
UA0051 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,840 | $10,000 | Implemented |
UA0051 # 05 Y:2010 | 05 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,177 | $5,219 | Implemented |
UA0051 # 06 Y:2010 | 06 | 2010 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $48,136 | $21,075 | Not Implemented |
UA0051 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,427 | $4,500 | Implemented |
UA0051 # 04 Y:2010 | 04 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,331 | $640 | Not Implemented |
UA0051 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,487 | $1,000 | Not Implemented |
IA0406 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $507 | $100 | Implemented |
IA0406 # 05 Y:2007 | 05 | 2007 | USE PHOTOCELL CONTROLS | $386 | $55 | Not Implemented |
IA0406 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,718 | $500 | Implemented |
IA0406 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $364 | $25 | Implemented |
IA0406 # 04 Y:2007 | 04 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,396 | $1,000 | Not Implemented |
IA0406 # 07 Y:2007 | 07 | 2007 | USE RADIANT HEATER FOR SPOT HEATING | $21,600 | $10,000 | Implemented |
IA0406 # 02 Y:2007 | 02 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $896 | $100 | Implemented |
UM0303 # 04 Y:2006 | 04 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,089 | $1,000 | Not Implemented |
UM0303 # 05 Y:2006 | 05 | 2006 | INSTALL OCCUPANCY SENSORS | $2,659 | $552 | Not Implemented |
UM0303 # 02 Y:2006 | 02 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,914 | $1,100 | Implemented |
UM0303 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $338,489 | $344,200 | Not Implemented |
UM0303 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,020 | $7,545 | Not Implemented |
IC0104 # 03 Y:2005 | 03 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $18,925 | $50,000 | Not Implemented |
IC0104 # 01 Y:2005 | 01 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $25,653 | $1,200 | Implemented |
IC0104 # 02 Y:2005 | 02 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,264 | $100 | Implemented |
IC0104 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $659 | $800 | Implemented |