IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 325 Structural Clay Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0839 # 13 Y:2013 13 2013 OPTIMIZE PLANT POWER FACTOR $12,090 $11,638 Implemented
OK0839 # 11 Y:2013 11 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $32,511 $25,606 Implemented
OK0839 # 09 Y:2013 09 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $873 $490 Implemented
OK0839 # 07 Y:2013 07 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,708 $5,684 Implemented
OK0839 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,494 $33,218 Implemented
OK0839 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,395 $1,750 Implemented
OK0839 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,540 $0 Implemented
OK0839 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,514 $27,500 Implemented
OK0717 # 01 Y:2005 01 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,551 $53,370 Implemented
OK0717 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,466 $1,039 Implemented
OK0717 # 05 Y:2005 05 2005 DEVELOP A REPAIR/REPLACE POLICY $1,002 $9,712 Implemented
OK0468 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $964 $2,998 Implemented
OK0468 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,638 $7,000 Implemented
OK0468 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18 $20 Implemented
OK0252 # 07 Y:1988 07 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $605 $0 Implemented
OK0252 # 06 Y:1988 06 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $260 $747 Implemented
OK0252 # 01 Y:1988 01 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,457 $0 Implemented
OK0106 # 09 Y:1983 09 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,084 $2,528 Implemented
OK0106 # 10 Y:1983 10 1983 USE UTILITY CONTROLLED POWER MANAGEMENT $6,953 $0 Implemented
OK0106 # 11 Y:1983 11 1983 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $68 $0 Implemented
OK0106 # 04 Y:1983 04 1983 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,552 $3,810 Implemented
OK0106 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $109 $73 Implemented
OK0106 # 01 Y:1983 01 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $35,511 $1,133 Implemented
OK0106 # 12 Y:1983 12 1983 USE OPTIMUM THICKNESS INSULATION $28,546 $6,480 Implemented
OK0067 # 08 Y:1982 08 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $113 $91 Implemented