IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

268

matching recommendations
Reset
SIC 3251 Brick And Structural Clay Tile
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0314 # 02 Y:2005 02 2005 DEVELOP A REPAIR/REPLACE POLICY $848 $1,393 Implemented
NC0314 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $8,544 $1,824 Implemented
MS0271 # 01 Y:2005 01 2005 USE OPTIMUM THICKNESS INSULATION $46,503 $3,038 Not Implemented
MS0271 # 02 Y:2005 02 2005 USE RADIANT HEATER FOR SPOT HEATING $1,726 $3,000 Not Implemented
MS0271 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,569 $3,249 Not Implemented
MS0271 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $888 $250 Not Implemented
MS0271 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $1,539 Not Implemented
SD0351 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $217,864 $75,000 Not Implemented
SD0351 # 02 Y:2004 02 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $80,766 $255,442 Implemented
SD0351 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,754 $39,050 Implemented
SD0351 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,248 $14,785 Implemented
SD0351 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,257 $350 Implemented
SD0351 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $663 $0 Implemented
SD0351 # 07 Y:2004 07 2004 PAY UTILITY BILLS ON TIME $1,391 $0 Implemented
LE0139 # 04 Y:2002 04 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,869 $7,000 Not Implemented
LE0139 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,359 $0 Implemented
LE0139 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $883 $2,000 Not Implemented
LE0139 # 01 Y:2002 01 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $97,133 $238,263 Implemented
WV0245 # 10 Y:2002 10 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,800 $690 Implemented
WV0245 # 11 Y:2002 11 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,000 $845 Not Implemented
WV0245 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,021 $4,000 Not Implemented
WV0245 # 08 Y:2002 08 2002 USE PHOTOCELL CONTROLS $579 $300 Implemented
WV0245 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,052 $930 Not Implemented
WV0245 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,109 $138 Implemented
WV0245 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $414 $100 Implemented