IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

268

matching recommendations
Reset
SIC 3251 Brick And Structural Clay Tile
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0427 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $1,000 Implemented
CO0427 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $240 $40 Implemented
CO0427 # 04 Y:1998 04 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $210 $0 Not Implemented
CO0427 # 05 Y:1998 05 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $34,700 $300,000 Not Implemented
CO0427 # 06 Y:1998 06 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $6,080 $30,000 Not Implemented
CO0427 # 07 Y:1998 07 1998 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $18,250 $27,000 Implemented
MS0097 # 01 Y:1997 01 1997 USE OPTIMUM THICKNESS INSULATION $78,996 $81,321 Not Implemented
MS0097 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $4,746 $1,326 Implemented
MS0097 # 03 Y:1997 03 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $828 $482 Not Implemented
MS0097 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,896 $8,648 Implemented
MS0097 # 05 Y:1997 05 1997 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $5,931 $1,158 Implemented
MS0097 # 06 Y:1997 06 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $26,125 $32,289 Implemented
NC0127 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,930 $1,880 Implemented
NC0127 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $130 $125 Not Implemented
NC0127 # 03 Y:1997 03 1997 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,143 $2,915 Not Implemented
NC0127 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $2,940 $17,640 Not Implemented
NC0127 # 05 Y:1997 05 1997 REDESIGN PROCESS $519 $50 Not Implemented
NC0127 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $109,730 $100,000 Not Implemented
NC0127 # 07 Y:1997 07 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $136,000 $100,000 Not Implemented
NC0127 # 08 Y:1997 08 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,985 $2,850 Not Implemented
CO0328 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,250 $11,610 Implemented
CO0328 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,930 $10,500 Implemented
CO0328 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,390 $1,710 Not Implemented
CO0328 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $310 $240 Implemented
AM0226 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $5,136 $5,690 Implemented