IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

276

matching recommendations
Reset
SIC 3251 Brick And Structural Clay Tile
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0365 # 06 Y:2000 06 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $660 $0 Implemented
AM0365 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $260 $100 Implemented
AM0365 # 08 Y:2000 08 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $120 $0 Implemented
MS0149 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $790 $263 Implemented
MS0149 # 02 Y:1999 02 1999 INSTALL TIMERS AND/OR THERMOSTATS $74 $119 Not Implemented
MS0149 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,504 $2,060 Implemented
MS0149 # 04 Y:1999 04 1999 USE OPTIMUM THICKNESS INSULATION $15,653 $9,593 Not Implemented
CO0427 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $500 $2,082 Implemented
CO0427 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $1,000 Implemented
CO0427 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $240 $40 Implemented
CO0427 # 04 Y:1998 04 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $210 $0 Not Implemented
CO0427 # 05 Y:1998 05 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $34,700 $300,000 Not Implemented
CO0427 # 06 Y:1998 06 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $6,080 $30,000 Not Implemented
CO0427 # 07 Y:1998 07 1998 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $18,250 $27,000 Implemented
MS0097 # 01 Y:1997 01 1997 USE OPTIMUM THICKNESS INSULATION $78,996 $81,321 Not Implemented
MS0097 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $4,746 $1,326 Implemented
MS0097 # 03 Y:1997 03 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $828 $482 Not Implemented
MS0097 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,896 $8,648 Implemented
MS0097 # 05 Y:1997 05 1997 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $5,931 $1,158 Implemented
MS0097 # 06 Y:1997 06 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $26,125 $32,289 Implemented
NC0127 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,930 $1,880 Implemented
NC0127 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $130 $125 Not Implemented
NC0127 # 03 Y:1997 03 1997 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,143 $2,915 Not Implemented
NC0127 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $2,940 $17,640 Not Implemented
NC0127 # 05 Y:1997 05 1997 REDESIGN PROCESS $519 $50 Not Implemented